Children's furniture manufacturers push: the production process of panel furniture should grasp the following basic principles

The company's Health Equipment Co., Ltd. mainly produces various combination slides, children's furniture, outdoor development, children's toys, naughty castles and other educational toy products. Company's official website :. support hotline. Company address: No. 16, Chuangqiang Road, Light Industry Industrial Park, Lucheng District, Wenzhou City.

We warmly welcome your patronage and our company will serve you wholeheartedly!

儿童家具厂家推送:板式家具的生产工艺要把握好以下几项基本原则

To formulate a process with strong feasibility and high efficiency, we must grasp the following basic principles:

Synchronization principle

That is, the parts of the product are in the general direction of the product as the unit, and the small direction is in the unit of the single package of the product. The components are controlled to reach the packaging process at the same time or within the smallest possible time difference to avoid such phenomena as packaging. The central content here is actually the working hours item in the process flow chart. The working hours of each part of the product must be clear, accurate, operable, and comprehensive factors are fully considered.

Downstream principle

Try to avoid the backflow of product parts and components on the production line. The backflow phenomenon will block the normal flow of other parts, just like the traffic flow on the road, making the entire workshop process appear disordered, which is not conducive to the management of the manager. The center here The content is the sequence of operations in the process flow table. The difficulty is how to solve the contradiction between the cross-operation of the production process of each part and the simultaneous arrival.

Sufficiency principle

Each process avoids the waste of the process itself. For example, the material-cutting process can be used to cut three plates at a time, and design it as two plates. Another example is that the hole position on a board in the drilling process can be completed twice, and you design it to be completed three or four times, which will cause waste of the process itself. In order to affect the processing efficiency, the first thing to do well is that the corresponding process documents must be comprehensive, that is, the cutting process must have a cutting chart, and the sawing sequence must be compiled, and the drilling process must have a drilling chart, and it must Different types of row drills have different optimized drilling plans, and at the same time, they must be controlled in conjunction with working hours.

Quality principles

No improvement in efficiency can be made at the expense of product quality in any process, because product quality is the life of the product, and mass production can only be maximized under the premise of quality assurance.

Progressive principle

A good process design is actually just the beginning of the next better and better process design. Process design itself is a process of constant exploration and improvement in practice. Only better is not the best.

Production management personnel should develop the habit of data management and data manipulation. Only in this way can we continuously improve and continually improve, surpass one new limit after another, and emotional management cannot be carried out according to experience. Today, I am in a good mood, and the workers also listen to the instructions, so the product process is very smooth, otherwise there will be no help if some influencing factors appear. Eventually, some people have managed production for several years or even more than a decade. The management level is only at a stage, and the progress is not obvious; while some people use a scientific and reasonable method to manipulate the production process, they can enter the state in a short time and Getting better. Because he is steadily advancing step by step.

The above five principles are the foundation of the process design, and only through continuous experience and application in practice can we finally master it fundamentally. With the advent of the second round of investment booms in various domestic panel furniture factories, the manufacturers will compete in panel production equipment, and the status and role of process design will become increasingly prominent. And first-class production equipment can only exert its maximum effect when combined with excellent process design. For example, in the first round of the domestic furniture industry panel machine competition in the mid-1990s, some well-known enterprises, such as: Dixin, Weian, Fuyun, etc., all used roller conveyors to transport the sheet material on the panel production line. The most direct embodiment of the principle of downstream flow in process design.

If the reverse flow phenomenon occurs in the unreasonable design of each process, and the plate is reversed, not only can the production efficiency not be improved, but the normal production sequence is hindered. Manufacturers who lack the process design think that this device is not easy to use, which is not as convenient as hand-carrying, and Not suitable for the processing of products with many varieties and multiple processes.


Portable Water Bottle For Pets

The two-in-one design of water and grain cups realizes the stratification of water and grain. The O-shaped drinking trough and the feeding bowl provide a larger feeding area for pets. It has an activated carbon filter element that can absorb impurities in the water, not only clean, every mouth They all drink at ease.

Portable Water Bottle For Pets,Portable Pet Drinking Fountain,Pet Drinking Fountain,Pet Water Bottle

DongGuan Lucky Pet Products Co., Ltd. , https://www.dgpetproduct.com

Posted on